Augusta Steel Solar Energy Solution

  1. Home
  2. Project
  3. Augusta Steel Solar Energy Solution

About the project

Client:

Bud Group

Project Date:

2023

Category:

Industrial

System Size and Type:

818.40kWp Roof Mounted

Annual Energy Generation:

1 344 850.05kWp per year

Project Location:

Gauteng

august steel solar energy solution

Project Information

Augusta Steel process a variety of steel profiles for the steel industry. Scaffold tubes, conveyance pipes and conveyor tubes are all produced at Augusta Steel. The company operates 24hrs a day and process between 5 to 70 tons of steel, daily.

Scope of Project

Augusta Steel is an intensive energy using business and this roof mounted system is built to meet the daytime load of the plant.